HomeRepair guidesINSTALLATION

Mitsubishi — INSTALLATION

A Mitsubishi service procedure — check it applies to your exact model before use.

Browse Mitsubishi generators & specs →

Procedure

  1. 1. Install the counterbalance shaft sprocket and
  2. screw on the bolt.
  3. 2. Install special tool Sprocket stopper (800404) as
  4. shown in the illustration to lock the counterbalance
  5. shaft.
  6. 3. Tighten the bolt, and then remove the special
  7. tool.
  8. Tightening torque: 45 ± 3 N·m

Tools required

  • 2. Install special tool Sprocket stopper (800404) as
  • tool.

Specs & torque values

  • 3 N·m

Source: manual:Mitsubishi-2.0L-2.4L-Service-Manual-106992-Revision-D.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.