HomeRepair guidesINSTALLATION

Mitsubishi — INSTALLATION

A Mitsubishi service procedure — check it applies to your exact model before use.

Browse Mitsubishi generators & specs →

Before you start

  • Note: After installation, keep the sealed area

Procedure

  1. 1. Apply a 3 mm diameter bead of FIPG to the
  2. indicated surface of the water outlet fitting
  3. Specified sealant: Permatex Ultra Grey Gasket
  4. Maker pt# 82194 or equivalent
  5. 2. Install the housing quickly, (within 15 minutes)
  6. while the sealant is wet, and tighten the bolts to
  7. the specified torque.
  8. Note: After installation, keep the sealed area
  9. away from the coolant for approximately one hour.

Specs & torque values

  • 82194

Source: manual:Mitsubishi-2.0L-2.4L-Service-Manual-106992-Revision-D.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.