Home›Repair guides›Military MEP›Installation of Load Cables

Military MEP MEP-804A — Installation of Load Cables

Installation · Load output terminal board

For the Military MEP MEP-804A, from the Military MEP operator's manual.

Applies to: Military MEP MEP-804A, Isuzu C-240 engine

Before you start

  • Never connect or disconnect load cables while generator set is running

Procedure

  1. Shutdown generator set
  2. Select required output terminals from Table 1
  3. Open output load terminal door
  4. Ensure jumper securely fastened between LO and ground
  5. Loosen terminal nuts on selected terminals
  6. Insert load cable ends through entrance box into studs
  7. Tighten load terminal nuts
  8. Secure wrench in bracket and close door

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Full service-parts list: Military MEP MEP-804A →, Isuzu C-240 engine →

Source: Military MEP operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Military MEP repair guides →