Military MEP MEP-804A — Installation of Load Cables
Installation · Load output terminal board
For the Military MEP MEP-804A, from the Military MEP operator's manual.
Applies to: Military MEP MEP-804A, Isuzu C-240 engine
Before you start
- Never connect or disconnect load cables while generator set is running
Procedure
- Shutdown generator set
- Select required output terminals from Table 1
- Open output load terminal door
- Ensure jumper securely fastened between LO and ground
- Loosen terminal nuts on selected terminals
- Insert load cable ends through entrance box into studs
- Tighten load terminal nuts
- Secure wrench in bracket and close door
Tools required
- Terminal nut wrench Amazon
Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.
Full service-parts list: Military MEP MEP-804A →, Isuzu C-240 engine →
Source: Military MEP operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.