Home›Repair guides›Military MEP›Battery Installation

Military MEP MEP-804A — Battery Installation

Maintenance · Batteries

For the Military MEP MEP-804A, from the Military MEP service manual.

Applies to: Military MEP MEP-804A

Before you start

  • Reconnect cables in reverse order of removal.
  • Never start the generator set unless it is properly grounded.

Procedure

  1. Position serviced and fully charged batteries in generator set.
  2. Apply general purpose grease to battery posts and cable terminal lugs.
  3. Install hook bolts and battery hold-down with new lock washers, washers, and nuts.
  4. Connect positive cable terminal lug.
  5. Position interconnect battery cable connect terminals.
  6. Connect negative battery cable terminal lug and close access door.

Full service-parts list: Military MEP MEP-804A →

Source: Military MEP service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Military MEP repair guides →