Military MEP MEP-804A — Battery charging alternator test (installed)
Testing & diagnosis
For the Military MEP MEP-804A, from the Military MEP service manual.
Applies to: Military MEP MEP-804A
Procedure
- Check battery voltage between alternator terminals BAT and R and ground with master switch in Prime Run Position.
- Start Gen Set operator and recheck voltage on terminal Pos Bat and ground.
- Voltage should be 28 + 2 VDC.
Tools required
- multimeter Amazon
Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.
Specs & values
- 28 + 2 VDC
Full service-parts list: Military MEP MEP-804A →
Source: Military MEP service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.