Military MEP — Installation of Load Cables
Installation · Output load terminal board TB2
From a Military MEP operator's manual — check it applies to your exact model before use.
Browse Military MEP generators & specs →
Before you start
- Make sure unit is completely shut down and free of any power source before maintenance.
- Never attempt to connect or disconnect load cables while generator set is running.
- A qualified technician must make the power connections and perform all continuity checks.
Procedure
- Set ENGINE CONTROL switch to OFF/RESET.
- Perform all BEFORE PMCS requirements.
- Set DEAD CRANK SWITCH to OFF.
- Set Battery Disconnect Switch to OFF.
- Select required output terminals from Table 1.
- Open output load terminal door; loosen selected terminal nuts.
- Insert cable ends through OUTPUT CABLES boots into terminals.
- Tighten terminal nuts; secure wrench and close door.
Tools required
- Terminal nut wrench Amazon
Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.
Specs & values
- 120/208 Vac: L1, L2, L3, and N
- 240/416 Vac: L1, L2, L3, and N
Source: Military MEP operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.