Home›Repair guides›Mecc Alte›Mounting of a parallel device

Mecc Alte — Mounting of a parallel device

Installation

From a Mecc Alte owner's manual — check it applies to your exact model before use.

Before you start

  • When requesting a parallel device it is indispensable to know the alternator rated data

Procedure

  1. Mount the parallel transformer as shown in tables 11-13-15-17
  2. Connect the power turns in series with the phase
  3. Connect the secondary winding in series to the sensing of the electronic regulator (tables 4-5)
  4. Remove the bridge that short-circuits the secondary winding to activate the device
  5. Verify about 4% voltage drop from no-load to full load at rated speed and cos φ 0.8

Specs & values

  • Voltage droop approx. 4%

Source: Mecc Alte owner's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Mecc Alte repair guides →