Home›Repair guides›Lombardini›Assembly of injection pumps

Lombardini — Assembly of injection pumps

Repair & overhaul

From a Lombardini service manual covering: 25LD330-2, 25LD425-2, KD 425-2. Check it applies to your exact model before use.

Procedure

  1. Insert barrel into pump casing with fuel inlet hole aligned with feeding connection.
  2. Insert delivery valve, copper gasket, spring, washer, filler, O-ring; temporarily tighten delivery connection.
  3. Insert plunger with helical profile opposite sleeve pin into control sleeve groove.
  4. Complete pump assembly with plunger, control sleeve, upper washer, retaining ring, spring, secure with spring holder washer.
  5. Tighten delivery valve holder to 4.5 ÷ 5 kgm torque.
  6. Check control sleeve turns freely throughout full stroke.
  7. Secure control sleeve using pin screwed into pump housing.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Delivery valve holder torque 4.5 ÷ 5 kgm

Source: Lombardini service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Lombardini repair guides →