Kohler TP 4.0 D — Pre-Start Checklist
Operation · pump
For the Kohler TP 4.0 D, from the Kohler owner's manual.
Browse Kohler generators & specs →
Procedure
- Ensure pump is at least 3.3 ft. (1 m) from building or other equipment.
- Place pump on a flat sturdy surface in a clean, ventilated location protected from weather.
- Make sure pump remains stable and immobile while in operation.
- Place pump as close as possible to liquid being drawn in.
- Submerge suction strainer (I) completely within liquid, taking care it is not blocked.
- Refer to all warning labels prior to starting.
- Check oil level. Add oil if low. Do not overfill.
- Check fuel level. Add fuel if low. Check fuel system for leaks.
- Check air cleaner components and air inlets are unobstructed; covers and guards in place.
Source: Kohler owner's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.