Kohler — Testing MPAC 550 Controller and Initializing Automatic Transfer Mechanism

Testing & diagnosis · MPAC 550 controller / transfer mechanism

From a Kohler service manual — check it applies to your exact model before use.

Browse Kohler generators & specs →

Before you start

  • Hazard of electric shock, explosion, or arc flash. This equipment must be installed and serviced by qualified electrical personnel.

Procedure

  1. For uninstalled load centers, provide a 240 V, 3-wire, single-phase, 60 Hz source capable of 5 A continuous.
  2. Deenergize the test source and remove the front cover.
  3. Connect the test source to the L1, N, and L2 power terminals of the load center.
  4. Connect a grounding wire from the test source to the grounding bar.
  5. Replace the front cover and energize the test source.
  6. Inspect the transfer mechanism location indicator; it should be in the Generator position.
  7. Ensure the generator circuit breaker is ON and open all branch circuit breakers.
  8. Check the MPAC 550 controller response; the mechanism should transfer to utility power.
  9. From the controller, command transfer to generator; the mechanism should transfer to generator.
  10. Verify the QO-PLILC branch circuit breakers switch ON and OFF correctly.
  11. Shut down the generator set.
  12. Close all branch circuit breakers and restore the main circuit breaker state.

Specs & values

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.