Kohler — Switch Installation Steps
Installation · Transfer switch
From a Kohler service manual — check it applies to your exact model before use.
Browse Kohler generators & specs →
Procedure
- Unpack and inspect the transfer switch upon receipt.
- Verify transfer switch voltage and frequency ratings match the source voltages and frequencies.
- Mount the transfer switch.
- Check the manual operation.
- Wire the normal power source (utility), emergency power source (generator set), and load circuits.
- Wire the generator set engine start connection.
- Connect accessories, if provided.
- Connect and initialize the electrical controls, as required.
- Check voltages and operation.
Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.