Kohler Series S340 — To Reconnect the Plug (In-Line Disconnect Plug)
Maintenance
For the Kohler Series S340, from the Kohler service manual.
Browse Kohler generators & specs →
Procedure
- If the Transfer Switch is in the Normal position, place the generator set starting switch in the OFF position, then open the emergency source circuit breaker.
- If the Transfer Switch is in the Emergency position, open the normal source circuit breaker.
- Reconnect the signal wires to the appropriate engine start terminals.
- Engage the In-Line Disconnect Plug by grasping and pressing together.
- If in Normal position, place the generator set starting switch in AUTOMATIC and close the emergency source circuit breaker.
- If in Emergency position, close the normal source circuit breaker; the load retransfers to normal after time delay. Place the generator set starting switch in AUTOMATIC.
Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.