Home›Repair guides›Kohler›Set Exercise Day & Period (Acc. 23)

Kohler Series S340 — Set Exercise Day & Period (Acc. 23)

Adjustments · Generator Set Exercising Timer

For the Kohler Series S340, from the Kohler service manual.

Browse Kohler generators & specs →

Procedure

  1. Decide what day (or days) of the week to exercise the plant.
  2. Remove the screw from the index cam lobe marked with the decided day.
  3. Hold the 24-hour dial from turning and unscrew the thumbnut by turning it clockwise; remove dial from center arbor-shaft.
  4. Set the ON tripper to the time of day when the exercise period should start and the OFF tripper to the stop time.
  5. On the last tripper of the day, insert the switch cutout index pin on the bottom side of the tripper.
  6. Turn the index cam counterclockwise until the desired exercise day is under the black tip of the cutoff switch lever.
  7. Thread a supplied screw into each position hole except the position(s) for the desired exercise day(s).
  8. Replace the dial on the center arbor-shaft, turn clockwise until the actual time of day aligns with the time pointer, and hand tighten the thumbnut.

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →