Home›Repair guides›Kohler›Electrical Operation / Functional Test

Kohler Series S340 — Electrical Operation / Functional Test

Testing & diagnosis · Transfer Switch

For the Kohler Series S340, from the Kohler service manual.

Browse Kohler generators & specs →

Before you start

  • Electrical shock! The Automatic Transfer Switch is energized; proceed with care! This test should be done only by a qualified electrician.

Procedure

  1. Close normal source circuit breaker.
  2. Use an accurate voltmeter to check phase-to-phase and phase-to-neutral voltages at the normal source terminals.
  3. Close emergency source circuit breaker.
  4. Manually start the engine-generator at the set.
  5. Check phase-to-phase and phase-to-neutral voltages at the emergency source terminals.
  6. If necessary, adjust the voltage regulator on the generator set.
  7. Shut down the generator set, then put starting control in 'automatic' position.
  8. Operate and hold door-mounted Test Switch until engine starts and runs, within 15 seconds.
  9. Transfer Switch operates to the emergency position (after Acc. 01-A time delay, up to 1 minute).
  10. Transfer Switch operates back to normal after Acc. 03-C time delay (up to 30 minutes).
  11. Acc. 04-C allows the engine to continue to run for an additional unloaded running time.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Engine starts and runs within 15 seconds
  • Acc. 01-A transfer time delay up to 1 minute
  • Acc. 03-C retransfer time delay up to 30 minutes

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.