Kohler — Fabricating a Rocker Arm and Crankshaft Spanner Wrench
A Kohler service procedure — check it applies to your exact model before use.
Browse Kohler generators & specs →
Procedure
- Find a used connecting rod from a 10 HP or larger engine. Remove and discard rod cap.
- Remove studs of a Posi-Lock rod or grind off aligning steps of a Command rod, so joint surface is flat.
- Find a 1 in. long capscrew with correct thread size to match threads in connecting rod.
- Use a flat washer with correct I.D. to slip on capscrew and approximately 1 in. O.D. Assemble capscrew and washer to joint surface of rod.
Tools required
- Grinder
Specs & torque values
- Used connecting rod (10 HP or larger engine)
- Capscrew (1 in. long)
- Flat washer
Source: manual:Kohler Engine SM_1669001_ZT710_ZT720_ZT730_ZT740.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.