Kohler — Real (kW) Load Sharing Calibration
Adjustments · Decision-Maker 6000 kW Load Sharing
From a Kohler service manual — check it applies to your exact model before use.
Browse Kohler generators & specs →
Before you start
- Do not reconnect Modbus cable to MCP until setup complete and computer disconnected.
Procedure
- Set the ramp rate to the desired setpoint.
- Place the first generator set online via the Start button.
- Place a second generator online; set its sync control to auto.
- Place load on the system and verify both generators share equally.
- Press the unload button for one generator and verify ramp-down.
- Verify the generator ramps to the sharing setpoint.
- Verify frequency remains within configured deadband.
- Update all identical generators with the same settings.
Tools required
- Kohler SiteTech Software Amazon
Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.
Specs & values
- Load bank at least 70% of total generator capacity
Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.