Home›Repair guides›Kohler›Service Entrance Installation

Kohler RDT 200ASE — Service Entrance Installation

Installation · Automatic Transfer Switch

For the Kohler RDT 200ASE, from the Kohler service manual.

Browse Kohler generators & specs →

Procedure

  1. Install in NEMA 3R aluminum enclosure
  2. Mount service disconnect circuit breaker on normal (utility) source
  3. Ensure 80% rating on utility disconnect
  4. Install generator set battery charger circuit breaker
  5. Connect normal source (utility) input
  6. Connect emergency source (generator) input
  7. Connect load output wiring
  8. Configure MPAC 500 controller settings

Specs & values

  • Service entrance model 200 amp
  • 42-circuit breaker load center available
  • NEMA 3R aluminum enclosure

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →