Kohler — Preparation and Storage
Installation · DPS System Components
From a Kohler service manual — check it applies to your exact model before use.
Browse Kohler generators & specs →
Before you start
- Do not use compressed air to clean components.
Procedure
- Allow equipment to warm to room temperature 24 hours before unpacking.
- Inspect packaging and components for shipping damage.
- Store components in original packing until final installation.
- Select a mounting site complying with local electrical codes.
- Mount components as close to load and power sources as possible.
- Ensure the supporting mounting surface is level and straight.
Specs & values
- Operating temperature 0-50 C
- Storage temperature -20-60 C
- Humidity 95% non-condensing
Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.