Home›Repair guides›Kohler›Oil Sentry Installation and Testing

Kohler — Oil Sentry Installation and Testing

Maintenance · Lubrication System

From a Kohler service manual covering: CV17, CV18, CV20, CV22, CV23, CV25, CV620, CV621, CV630, CV640, CV641, CV670…. Check it applies to your exact model before use.

Browse Kohler generators & specs →

Procedure

  1. Apply pipe sealant with Teflon to threads of switch.
  2. Install switch into tapped hole in breather cover.
  3. Torque switch to 4.5 N·m (40 in. lb.).
  4. Testing: connect continuity tester across blade terminal and metal case of switch.
  5. With 0 psi applied, tester should indicate continuity (switch closed).
  6. Gradually increase pressure; through range of 3-5 psi tester should indicate change to no continuity (switch open).
  7. Switch should remain open as pressure is increased to 90 psi maximum.
  8. Gradually decrease pressure through 3-5 psi; tester should indicate change to continuity down to 0 psi.
  9. Replace switch if it does not operate as specified.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • 4.5 N·m (40 in. lb.)
  • 3-5 psi switch point
  • 90 psi maximum

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →