Home›Repair guides›Kohler›No-Load Test Procedure

Kohler — No-Load Test Procedure

Operation · MCP 3000

From a Kohler service manual — check it applies to your exact model before use.

Browse Kohler generators & specs →

Before you start

  • An ATS start signal during a no load test aborts the test and enters emergency mode.

Procedure

  1. Navigate to the no load test screen on the HMI.
  2. Verify generator ready status is active (green) for all generators.
  3. Touch test duration field to set test time in minutes.
  4. Touch the Start button to begin the no load test.
  5. First generator reaching rated frequency/voltage closes the bus.
  6. If timer is configured, it expires and paralleling breaker opens.
  7. To manually stop, touch the Stop button.

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →