Kohler — No-Load Test Procedure
Operation · MCP 3000
From a Kohler service manual — check it applies to your exact model before use.
Browse Kohler generators & specs →
Before you start
- An ATS start signal during a no load test aborts the test and enters emergency mode.
Procedure
- Navigate to the no load test screen on the HMI.
- Verify generator ready status is active (green) for all generators.
- Touch test duration field to set test time in minutes.
- Touch the Start button to begin the no load test.
- First generator reaching rated frequency/voltage closes the bus.
- If timer is configured, it expires and paralleling breaker opens.
- To manually stop, touch the Stop button.
Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.