Home›Repair guides›Kohler›Automatic Operation Test Procedure

Kohler MPAC 750 — Automatic Operation Test Procedure

Operation · Automatic transfer switch

For the Kohler MPAC 750, from the Kohler service manual.

Browse Kohler generators & specs →

Before you start

  • Close and lock the enclosure door before starting the test procedure.

Procedure

  1. Check the controller LED indicators to verify that the Source N Position and Source N Available indicators are lit.
  2. Verify that the generator set master switch is in the AUTO position.
  3. Press and hold the Test button for 6 seconds or longer to start a loaded test.
  4. Verify that the generator set starts and the Source E Available LED lights.
  5. Verify that the switch transfers the load to Source E.
  6. Press and hold the Test pushbutton for about 2 seconds to end the test.
  7. Verify that the switch transfers the load back to Source N.
  8. After the engine cooldown time delay expires, verify that the generator set stops.

Specs & values

  • Test button held 6 seconds or longer to start loaded test

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →