Kohler MPAC 1200 / MPAC 1500 — Voltage, Frequency, and Phase Rotation Measurement Procedure

Testing & diagnosis · Transfer switch sources

For the Kohler MPAC 1200 / MPAC 1500, from the Kohler service manual.

Browse Kohler generators & specs →

Before you start

  • Perform voltage checks in the order given to avoid damaging the transfer switch.
  • Do not connect or disconnect the controller wiring harness when power is connected.

Procedure

  1. Verify the generator set master switch is OFF and both power sources are disconnected.
  2. Disconnect the power switching device and controller wiring harnesses at the inline disconnect plug.
  3. Manually operate the transfer switch to position E.
  4. If Source N is a generator set, start the generator.
  5. Close the Source N circuit breaker or switch.
  6. Check Source N phase-to-phase and phase-to-neutral voltages and frequency.
  7. Use a phase rotation meter to check Source N phase rotation; rewire terminals if necessary.
  8. Stop the generator set and disconnect Source N.
  9. Manually operate the transfer switch to position N and repeat steps 4 through 8 for Source E.
  10. Disconnect both sources to the transfer switch.
  11. Connect the power switching device and controller wiring harnesses at the inline disconnect plug.
  12. Close and lock the transfer switch enclosure door.
  13. Reconnect both power sources.
  14. Move the generator set master switch to the AUTO position.

Tools required

  • Digital voltmeter with insulated probes Amazon
  • Phase rotation meter Amazon

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →