Home›Repair guides›Kohler›Automatic Operation Test Procedure

Kohler MPAC 1200 — Automatic Operation Test Procedure

Operation · Transfer switch / MPAC 1200 controller

For the Kohler MPAC 1200, from the Kohler service manual.

Browse Kohler generators & specs →

Before you start

  • Close and lock the enclosure door before starting the test procedure.

Procedure

  1. Check controller LED indicators; verify Position N and Source N Available indicators are lit.
  2. Verify the generator set master switch is in the AUTO position.
  3. From the main screen press Test; enter the test password and press OK.
  4. Press the down arrow button to display Type of Test Loaded.
  5. Press the Start button.
  6. Verify the generator set starts and the Source E Available LED lights.
  7. Verify the switch transfers the load to Source E; observe LED indicators and display as time delays execute.
  8. Press the End Test button.
  9. Verify the switch transfers the load back to Source N.
  10. After the engine cooldown time delay expires, verify the engine start signal is removed and the generator set stops.

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →