- Place all Decision-Maker 6000 controllers in OFF mode.
- Verify 24 VDC between TB2-1 and TB2-2.
- Install fuses F1 and F2.
- Verify the RS-485 communication daisy chain is connected.
- Verify the PLC powers up and enters Run Mode.
- Verify the HMI powers up and displays the main screen.
- Log in to the HMI with username Setup (factory default password Setup).
- Set the number of generators in the system.