Kohler — Manual Transfer Procedure (Supervised Transfer Control Switch)
Operation
From a Kohler service manual — check it applies to your exact model before use.
Browse Kohler generators & specs →
Before you start
- The switch must not be removed from non-automatic switches in the field.
Procedure
- An event occurs such as loss of the connected source, loaded exercise start, or an operator starts a loaded test.
- The ATS executes time delays and signals the generator set engine to start.
- MANUAL TRANSFER is displayed and the Not-in-Auto LED flashes.
- Turn the keyswitch to the TRANSFER position and release it.
- The load is transferred to the standby source, if available.
- When the preferred source returns or the test ends, turn the keyswitch to TRANSFER and release to transfer back.
Tools required
- Key-operated supervised transfer control switch (AUTO/MANUAL/TRANSFER) Amazon
Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.
Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.