Home›Repair guides›Kohler›Manual Operation Procedure, 800--4000A ICCB Models

Kohler — Manual Operation Procedure, 800--4000A ICCB Models

Operation · Power switching device (ICCB)

From a Kohler service manual — check it applies to your exact model before use.

Browse Kohler generators & specs →

Before you start

  • Perform the service disconnect procedure before manually operating the transfer switch.

Procedure

  1. Push the breaker's TEST pushbutton; the breaker should open.
  2. Press the reset button to reset the breaker.
  3. Repeat for the other power switching unit.

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →