Home›Repair guides›Kohler›Manual Operation Procedure 2 (100-200 amp 3-phase, and 400 amp 3-phase)

Kohler — Manual Operation Procedure 2 (100-200 amp 3-phase, and 400 amp 3-phase)

Operation · Contactor / transfer mechanism

From a Kohler service manual covering: RXT-JFNC-0100A, RXT-JFNC-0200A, RXT-JFNC-0400. Check it applies to your exact model before use.

Browse Kohler generators & specs →

Before you start

  • Never use the maintenance handle to transfer the load with the power connected. Disconnect both power sources before manually operating the switch.

Procedure

  1. If equipped with a maintenance handle, remove it from its storage location inside the enclosure
  2. Insert the maintenance handle or a tool such as a screwdriver into the hole in the shaft on the left side of the operator
  3. Move the maintenance handle or tool up or down to manually operate the transfer switch; it should operate smoothly without binding
  4. Return the transfer switch to the Normal position
  5. Remove the maintenance handle and return it to the storage location

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →