Home›Repair guides›Kohler›Load Shed Setup (Index 9)

Kohler M340 — Load Shed Setup (Index 9)

Operation · M340 controller

For the Kohler M340, from the Kohler service manual.

Browse Kohler generators & specs →

Procedure

  1. Load-shed circuit board must be installed.
  2. Enter index 9 for Load Shed in minutes:seconds.
  3. Set NORM-EMER before, after, sequence times and loads return number.
  4. Set EMER-NORM before, after, sequence times and loads return number.

Specs & values

  • Up to 9 loads may be controlled by sequence
  • If sequence is 00:00 all relays energize simultaneously

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →