Kohler M340 — Electrical Operation Test
Operation · Automatic transfer switch
For the Kohler M340, from the Kohler service manual.
Browse Kohler generators & specs →
Procedure
- Press and hold the test pushbutton for 15 seconds.
- The generator set should start and run after the time delay engine start (TDES) completed timing.
- The transfer switch will transfer to the emergency position after the normal-to-emergency time delay (TDNE) has completed timing.
- Release the test pushbutton. The transfer switch retransfers to normal after the emergency-to-normal time delay.
- Time delay engine cooldown (TDEC) allows the engine to continue running for an unloaded running time.
- Close load circuit breaker(s) when loads may be safely energized.
Specs & values
- TDES
- TDNE
- TDEC
Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.