  • If the optional load shed kit is installed, the loads connected to the remote-controlled circuit breakers will be turned off during a loaded exercise.

Procedure

  1. On the day and time that you want the exercise to run every week, press and hold the Exercise button for at least 6 seconds, until both the GEN available and GEN position LEDs flash.
  2. The generator set starts.
  3. The optional load shed circuit breakers open.
  4. The ATS transfers the load to generator set.
  5. The GEN available and GEN position LEDs continue to flash throughout the exercise run to indicate a loaded exercise.
  6. After approximately 20 minutes, the ATS transfers the load back to the normal source.
  7. The optional load shed circuit breakers close.
  8. The ATS signals the generator set to stop.