Kohler — Loaded Exercise (set exercise timer)
Operation · Transfer switch controller Exercise button
From a Kohler service manual — check it applies to your exact model before use.
Browse Kohler generators & specs →
Before you start
- If the optional load shed kit is installed, the loads connected to the remote-controlled circuit breakers will be turned off during a loaded exercise.
Procedure
- On the day and time that you want the exercise to run every week, press and hold the Exercise button for at least 6 seconds, until both the GEN available and GEN position LEDs flash.
- The generator set starts.
- The optional load shed circuit breakers open.
- The ATS transfers the load to generator set.
- The GEN available and GEN position LEDs continue to flash throughout the exercise run to indicate a loaded exercise.
- After approximately 20 minutes, the ATS transfers the load back to the normal source.
- The optional load shed circuit breakers close.
- The ATS signals the generator set to stop.
Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.