Home›Repair guides›Kohler›Installing MPAC 550 Controller

Kohler — Installing MPAC 550 Controller

Installation

From a Kohler service manual — check it applies to your exact model before use.

Browse Kohler generators & specs →

Before you start

  • Hazardous voltage. This equipment must be installed and serviced by qualified electrical personnel.

Procedure

  1. For Type 1 enclosures only, install the insulator over the top mounting foot of the controller.
  2. Install the MPAC 550 controller in the load center enclosure.
  3. For Type 1 enclosures, secure with two 10-32 x 5/16 in. screws; torque to 3.4 Nm (30 in. lb.).
  4. For Type 3R enclosures, secure with four 10-32 x 5/16 in. screws; torque to 3.4 Nm (30 in. lb.).
  5. Connect the 6-pin control harness segment to the long control harness; ensure plugs are fully engaged.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • 3.4 Nm (30 in. lb.)

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →