Kohler — Installing Grounding Leads
Installation · Grounding bus
From a Kohler service manual — check it applies to your exact model before use.
Browse Kohler generators & specs →
Procedure
- Slide the spade connector of the shield wire between the generator control unit mounting screw and housing.
- Connect grounding lead PE1 from the MPAC 550 controller to the grounding bus.
- Connect grounding lead PE1 from the transfer mechanism to the grounding bus.
- Connect grounding lead PE1 from the communication harness to the grounding bus.
- Torque the screws to 2.3 Nm (20 in. lb.).
Specs & values
- 2.3 Nm (20 in. lb.)
Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.