Home›Repair guides›Kohler›Installing Generator Terminal Block

Kohler — Installing Generator Terminal Block

Installation

From a Kohler service manual — check it applies to your exact model before use.

Browse Kohler generators & specs →

Before you start

  • Connections are polarity-sensitive. The transfer mechanism will not operate if the connections are reversed.

Procedure

  1. Bend the insulating cover to fit around the terminal block before installing it.
  2. Orient the terminal block so the two studs are at the top and install it in the enclosure.
  3. Secure with two 10-32 x 1/2 in. hex head screws; torque to 3.4 Nm (30 in. lb.).
  4. Connect leads AL1-A and AL2-A (power) to terminals L1 and L2 on the generator circuit breaker.
  5. Torque 35-70 A circuit breakers to 5.1 Nm (45 in. lb.); 80-125 A breakers to 5.7 Nm (50 in. lb.).
  6. Connect leads AL1-A and AL2-A to terminals L1 and L2 on the generator terminal block.
  7. Install control leads AL1-A and AL2-A on top of the power leads on the terminal block.
  8. Secure with a 1/4 x 5/8 in. plain washer and 1/4-20 x 7/16 in. hex nut washer assembly.
  9. Torque the nuts to 6.8 Nm (60 in. lb.).

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • 3.4 Nm (30 in. lb.)
  • 5.1 Nm (45 in. lb.)
  • 5.7 Nm (50 in. lb.)
  • 6.8 Nm (60 in. lb.)

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →