Kohler — Installing Communication Wire Harness
Installation · Communication harness
From a Kohler service manual — check it applies to your exact model before use.
Browse Kohler generators & specs →
Before you start
- If installing a load shed module, omit this procedure and skip to Installing Load Shed Module.
Procedure
- Install the green pluggable connector into terminal J3 on the transfer mechanism.
- Install the green pluggable connector at the other end into terminal TB1 on the MPAC 550 controller.
- Slide the spade connector of wire 18 (shield) between the generator control unit mounting screw and housing.
- Secure the mounting screw, taking care not to crush the shield wire connector.
Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.