Home›Repair guides›Kohler›Installing Automatic Transfer Mechanism

Kohler — Installing Automatic Transfer Mechanism

Installation

From a Kohler service manual — check it applies to your exact model before use.

Browse Kohler generators & specs →

Before you start

  • Connections are polarity-sensitive. Ensure wiring harnesses are routed as illustrated.

Procedure

  1. If present, remove the center screw holding the main circuit breaker in place.
  2. Install the transfer mechanism mounting post; torque to 3.4 Nm (30 in. lb.).
  3. Check the location indicator; if not in the generator position, manually set it.
  4. Set the main circuit breaker handle to OFF and the generator circuit breaker handle to ON.
  5. Install leads LC1-A and LC2-A of the long control harness onto the bus bar studs.
  6. Secure both connections with a 1/4-20 x 7/16 in. hex nut assembly; torque to 5.7-8.5 Nm (50-75 in. lb.).
  7. Connect lead N-A to the load-center neutral; torque to 2.3 Nm (20 in. lb.).
  8. Mount the transfer mechanism with the actuator spring on the right side of the generator CB handle.
  9. Secure with one 8-32 x 1/2 in. Phillips screw; torque to 1.7 Nm (15 in. lb.).
  10. If a Spanish label is required, apply it on top of the English hazard label.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • 3.4 Nm (30 in. lb.)
  • 5.7-8.5 Nm (50-75 in. lb.)
  • 2.3 Nm (20 in. lb.)
  • 1.7 Nm (15 in. lb.)

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →