Kohler — Digital Power Meter Kit Installation Procedure

Installation · Digital power meter, current transformers (CTs), ATS enclosure

From a Kohler service manual — check it applies to your exact model before use.

Browse Kohler generators & specs →

Before you start

  • Hazardous voltage. Disconnect all power sources before opening the enclosure.
  • Deenergize all power sources before servicing; disconnect battery negative (-) leads first and reconnect last.

Procedure

  1. Disable the generator set(s) to prevent accidental starting; place master switch in OFF or press OFF/RESET.
  2. Disconnect power to the transfer switch.
  3. Open the ATS enclosure.
  4. Install the current transformers (CTs) on the load leads with the dot or mark pointing toward the power source.
  5. Connect the black and white CT leads to the power meter (PM) as shown in the wiring diagram.
  6. Optional: connect RS-485 serial communication; connect network devices in parallel; use terminating jumper across A- and T on the last device.
  7. Optional: connect digital/relay outputs as shown in the connection diagrams.
  8. Reconnect power to the transfer switch.
  9. Re-enable the generator set(s); reconnect battery negative (-) lead last and power to battery charger.

Specs & values

  • Single-phase kits use two CTs; three-phase kits use three CTs.

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.