Before you start

  • Hazardous voltage. Only authorized personnel should open the enclosure. On service entrance transfer switches, the line side lugs are active at all times.

Procedure

  1. Perform the service disconnect procedure in Section 6.3 or 6.4.1.
  2. Note: There is still power to the controller assembly after the service disconnect procedure is completed.
  3. Open the enclosure door and move the control circuit isolation switch to the OFF position.
  4. Use a voltmeter to verify that there is no power to the ATS controller assembly before removing the controller.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →