Home›Repair guides›Kohler›Connection Procedure (AC field connections)

Kohler — Connection Procedure (AC field connections)

Installation · Field-connection terminal block

From a Kohler service manual covering: 12RES, 17RES, 18RES. Check it applies to your exact model before use.

Applies to: Kohler 12RES, Kohler 17RES, Kohler 18RES

Before you start

  • Hazardous voltage. Backfeed to the utility system can cause property damage, severe injury, or death. Install an automatic transfer switch.

Procedure

  1. Connect the leads from the transfer switch emergency source lugs to the L1 and L2 connections on the generator set terminal block.
  2. Connect the neutral (L0) and ground (GRD) leads from the ATS and the main panel to the corresponding connection points on the terminal block.
  3. Connect utility power to the terminal block for the 120 VAC receptacles for the battery charger and optional carburetor heater.

Specs & values

  • Refer to the decal near the terminal block for connections
  • Route AC leads through flexible conduit

Full service-parts list: Kohler 12RES →, Kohler 17RES →, Kohler 18RES →

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →