Home›Repair guides›Kohler›Checking Mechanical Installation

Kohler — Checking Mechanical Installation

Installation · Conversion kit

From a Kohler service manual — check it applies to your exact model before use.

Browse Kohler generators & specs →

Before you start

  • Do not perform high-potential dielectric testing on the Intelligent Load Center.

Procedure

  1. Remove all power from the load center; provide an alternate light source.
  2. Open the generator disconnect and lock out the generator from starting and running.
  3. Open the main feeder disconnect supplying power to the load center and apply lockouts.
  4. Remove the front cover of the load center.
  5. Inspect the load center interior assembly mounting ears for proper engagement in the slots.
  6. Vacuum interior debris; do not use compressed air.
  7. Verify the fuse insulating covers and generator terminal block insulating cover are installed.
  8. Verify the insulator between the load center interior assembly and MPAC 550 mounting bracket is installed.
  9. Verify harnesses are routed and bundled as shown and are not altered or rerouted.
  10. Verify all wire ends of the harnesses are terminated.
  11. Verify the 6-pin and 9-pin connectors are fully engaged.
  12. Verify all wiring is terminated on the correct component terminals.
  13. Verify the fuses are of the listed manufacturer and type.
  14. Verify the transfer mechanism frame is properly seated on the circuit breakers.
  15. Replace the load center front cover and secure the cover screws.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.