Home›Repair guides›Kohler›Voltage Calibration Using SiteTech

Kohler 48RCLB / 60RCLA — Voltage Calibration Using SiteTech

Adjustments · RDC2 controller

For the Kohler 48RCLB / 60RCLA, from the Kohler service manual.

Applies to: Kohler 48RCLB, Kohler 60RCLA, Kohler KG6208 engine

Before you start

  • Testing live electrical circuits. Hazardous voltage or current will cause severe injury or death.

Procedure

  1. With generator off, connect a digital multimeter across L1 and L2 (AC volts).
  2. Start the generator set by pressing RUN.
  3. Compare the voltmeter reading to the controller-displayed voltage.
  4. Calculate a new value: (Vmeter / Vcontrol) x Fold = Fnew.
  5. Enter the new Genset Calibration Factor Voltage L1-L2 in SiteTech and click Apply Changes.
  6. Wait a few seconds and re-compare voltmeter and controller readings.
  7. Press OFF to stop the generator set.
  8. Repeat for L2-L3 and L3-L1 if necessary (three-phase only).

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • (Vmeter / Vcontrol) x Fold = Fnew
  • Example: (241.2 / 240) x 1.0063 = 1.0113

Full service-parts list: Kohler 48RCLB →, Kohler 60RCLA →

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.