Kohler 350REZX — 1 Hour Load Bank 100% load
Testing & diagnosis · genset
For the Kohler 350REZX, from the Kohler manual.
Applies to: Kohler 350REZX
Procedure
- Run genset at 100% load for 1 hour load bank test.
- Readings of load steps taken after load application.
- Exhaust temp reading location: 90 aft of turbine exhaust housing.
- Record KW, load %, Hz, load amps, voltage, water temp, oil pressure, exhaust temp, gas pressure, ambient temp, time and hour meter.
Tools required
- load bank Amazon
Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.
Specs & values
- 1 hour at 100% load
Full service-parts list: Kohler 350REZX →
Source: Kohler manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.