Home›Repair guides›Kohler›Operation Tests

Kohler 12RES — Operation Tests

Operation · transfer switch

For the Kohler 12RES, from the Kohler service manual.

Applies to: Kohler 12RES

Procedure

  1. Check source voltages per ATS Operation and Installation manual.
  2. Run a test as described in the ATS manual.
  3. Set the exerciser: hold button 3 sec for unloaded exercise, 6 sec for loaded exercise.

Full service-parts list: Kohler 12RES →

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Kohler repair guides →