Kohler 12RES — Mount the generator set
Installation · Mounting base
For the Kohler 12RES, from the Kohler service manual.
Applies to: Kohler 12RES
Procedure
- Prepare concrete pad, 3000 PSI minimum.
- Use 3/8 inch anchor bolt and nut with 3/8 inch washer, typ 4 places.
- Set unit on plastic base over concrete pad.
- Verify bolted connection shear load 150 lbs/bolt and pull out force 200 lbs/bolt.
- For 150 mph high wind, use high wind mounting detail.
Tools required
Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.
Specs & values
- 3/8" anchor bolt & nut
- 3/8" washer typ 4 places
- Shear load 150 lbs/bolt
- Pull out force 200 lbs/bolt
- Concrete pad 3000 PSI min
Full service-parts list: Kohler 12RES →
Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.