Kohler 12RES — Field Connections to the Terminal Block

Installation · Electrical connections

For the Kohler 12RES, from the Kohler service manual.

Applies to: Kohler 12RES

Before you start

  • Hazardous voltage. Backfeed to the utility system can cause property damage, severe injury, or death.

Procedure

  1. Remove the cover from the electrical connection access area.
  2. Drill holes for conduit fittings and feed cables through the openings.
  3. Connect leads from the transfer switch emergency source lugs to L1 and L2 on the terminal block.
  4. Connect the neutral (L0) and ground (GRD) leads from the ATS and main panel to the terminal block.
  5. Connect 120 VAC utility power to the terminals marked Utility Power.
  6. Connect the engine start leads from the automatic transfer switch or remote start switch to terminals 3 and 4.
  7. Replace the cover over the electrical connection access area.

Full service-parts list: Kohler 12RES →

Source: Kohler service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.