Kohler 12RES — Exercising Generator Set
Operation
For the Kohler 12RES, from the Kohler operator's manual.
Applies to: Kohler 12RES, Kohler CH 740 engine
Procedure
- Perform all prestart checks before starting exercise procedure.
- Operate generator set without load once each week for 20 minutes.
- Listen for a smooth-running engine and inspect for fluid or exhaust leaks.
- Check air inlets and outlets and remove items restricting airflow.
Specs & values
- Without load once each week for 20 minutes
Full service-parts list: Kohler 12RES →
Source: Kohler operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.