Home›Repair guides›John Deere›Valve Clearance Adjustment

John Deere — Valve Clearance Adjustment

Adjustments · Valve train

From a John Deere service manual — check it applies to your exact model before use.

Browse John Deere generators & specs →

Before you start

  • The valve clearance must be adjusted when engine is cold

Procedure

  1. Rotate engine flywheel in running direction until No.1 piston (front) is at TDC on compression stroke
  2. Insert timing pin into flywheel bore
  3. Adjust valve clearance on No. 1 and 2 exhaust valves and No. 1 and 3 intake valves
  4. Turn crankshaft 360° and reinsert timing pin
  5. Adjust valve clearance on No. 3 exhaust valve and No. 2 intake valve

Tools required

  • JDE83 or JDG820 Flywheel Turning Tool Amazon
  • JDE81-4 or JDG1571 Timing Pin Amazon

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Intake valve clearance 0.35 mm (0.014 in.)
  • Exhaust valve clearance 0.45 mm (0.018 in.)
  • Firing order 1-2-3 Amazon Amazon eBay

Source: John Deere service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More John Deere repair guides →