Home›Repair guides›John Deere›Check and Adjust Engine Valve Clearance

John Deere — Check and Adjust Engine Valve Clearance

Adjustments · Cylinder head / valve train

From a John Deere operator's manual covering: 4039, 4045, 6059, 6068, RG4697. Check it applies to your exact model before use.

Applies to: John Deere 4039, John Deere 4045, John Deere 6059, John Deere 6068

Before you start

  • Engine valve clearance MUST BE checked and/or adjusted with engine COLD
  • Any time air intake system is opened, it must be checked for leaks before machine is returned to service

Procedure

  1. Remove rocker arm cover and crankcase ventilator hose.
  2. Remove plugs or cover plate from flywheel housing timing holes.
  3. Rotate engine in running direction (clockwise viewed from front) until No. 1 cylinder is at TDC compression stroke. Insert timing pin in flywheel.
  4. Check and adjust valve clearance to specifications.
  5. Tighten jam nut to 27 N-m (20 lb-ft) after adjusting valve clearance.
  6. Lock No. 1 piston at TDC compression stroke, adjust valves per firing order, turn crankshaft 360 degrees and adjust remaining valves.

Tools required

  • JD281A, JDE83, or JDG820 Engine Rotation Tool Amazon
  • JDE81-4 Timing Pin Amazon

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

Full service-parts list: John Deere 4039 →, John Deere 4045 →, John Deere 6068 →

Source: John Deere operator's manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More John Deere repair guides →