HomeRepair guidesAir Purge Valve Removal and Installation

John Deere — Air Purge Valve Removal and Installation

A John Deere service procedure — check it applies to your exact model before use.

Browse John Deere generators & specs →

Procedure

  1. Install elbow (D) and diagnostic port fitting (E) if removed.
  2. Tighten diagnostic fitting to specifications (24 N•m or 18 lb-ft).
  3. Install cap (C).

Specs & torque values

  • Air Purge Valve Diagnostic Port Fitting—Torque: 24 N•m (18 lb-ft)

Source: manual:CTM188.pdf. Figures and steps are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.