Home›Repair guides›John Deere›Check and Adjust Valve Clearance

John Deere 6101 — Check and Adjust Valve Clearance

Adjustments · Cylinder head and valve train

For the John Deere 6101, from the John Deere service manual.

Applies to: John Deere 6101

Before you start

  • Disconnect negative battery terminal before valve adjustment

Procedure

  1. Remove rocker arm cover from cylinder head.
  2. Remove timing hole plugs; install JDE81-1 turning tool and JDE81-4 timing pin.
  3. Rotate engine until timing pin engages flywheel at No. 1 TDC compression.
  4. Check intake 0.33-0.43 mm and exhaust 0.58-0.68 mm with engine cold.
  5. Adjust Nos. 1, 3, 5 exhaust and Nos. 1, 2, 4 intake valves.
  6. Loosen locknut; turn adjusting screw until feeler gauge slips with slight drag.
  7. Tighten locknut to 27 N·m (20 lb-ft); recheck clearance.
  8. Rotate flywheel 360 degrees and adjust remaining valves.

Tools required

Tool links are Amazon searches (affiliate links); manufacturer special tools may only be available from a dealer.

Specs & values

  • Intake 0.33-0.43 mm cold
  • Exhaust 0.58-0.68 mm cold
  • Valve adjusting screw lock nut 27 N·m (20 lb-ft)

Full service-parts list: John Deere 6101 →

Source: John Deere service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More John Deere repair guides →