Home›Repair guides›Iveco/FPT›Assembly procedure of the ADC100 electronic activator on Stanadyne series D injection pumps

Iveco/FPT — Assembly procedure of the ADC100 electronic activator on Stanadyne series D injection pumps

Installation · Stanadyne injection pump

From a Iveco/FPT service manual covering: N45, N67, NEF45 SM2. Check it applies to your exact model before use.

Applies to: Iveco/FPT N45, Iveco/FPT N67, Iveco/FPT NEF45 SM2

Before you start

  • Coupling mistakes between the actuator hook and the injection pump lever can cause motor over-speed conditions.

Procedure

  1. Remove the three screws of the pump cover and remove the cover carefully.
  2. Remove the connection of the fuel return pipe and the sealing from the cover.
  3. Disconnect the wire of the stop electro-valve from the clamp and isolate it.
  4. Reassemble the connection and the pump cover's original sealing on the ADC100 electronic actuator.
  5. Slide the actuator towards the rear of the pump until the U-shaped hook engages the pump lever.
  6. Tighten the ADC100 actuator to the injection pump using the supplied screws.
  7. Reconnect the fuel return pipe to the connection on the actuator.

Source: Iveco/FPT service manual. Steps and values are as documented; always cross-check against the official manual and any later revisions for your exact serial number before servicing.

More Iveco/FPT repair guides →